Content

Chapter    Title                                                                                                                           Page

1.1              Background_ 1

1.2              Project Organization_ 1

1.3              Environmental Status in the Reporting Period_ 1

1.4              Summary of EM&A Requirements_ 1

2.1              Introduction_ 4

2.2              Air Quality 4

2.3              Construction Noise_ 4

2.4              Water Quality 4

2.5              Ecology 4

2.6              Landscape and Visual 4

3.1              Impact Monitoring Schedule_ 4

3.2              Results of Impact Monitoring_ 4

4.1              Introduction_ 4

4.2              Monitoring of Birds_ 4

4.3              Monitoring of Herpetofauna_ 4

4.4              Monitoring of Dragonflies and Butterflies_ 4

4.5              Monitoring of Mammals_ 4

4.6              Monitoring of Water Quality 4

4.7              Management Activities_ 4

4.8              Summary 4

5.1              Site Inspections_ 4

5.2              Construction Phase Audit Summary 4

6.1              Site Inspection_ 4

6.2              Advice on the Solid and Liquid Waste Management Status_ 4

6.3              Status of Environmental Licenses and Permits_ 4

6.4              Recommended Mitigation Measures_ 4

7.1              Record on Non-compliance of Action and Limit Levels_ 4

7.2              Record on Environmental Complaints received_ 4

7.3              Record on Notifications of Summons and Successful Prosecution_ 4

7.4              Review of Reasons for and Implications of Non-compliance, Complaints, Summons and Prosecutions_ 4

7.5              Follow-up Actions Taken_ 4

7.6              Cumulative Statistics for Complaints, Notifications of Summons and Successful Prosecutions_ 4

8.1              Site Preparatory Works and Construction Works for the Coming Month_ 4

8.2              Key Issues for the Coming Month_ 4

8.3              Monitoring Schedule for the Coming Month_ 4

8.4              Conclusions and Recommendations_ 4

 

Tables

Table 1.1:__ Summary of Impact EM&A Monitoring Requirements_ 2

Table 1.2:__ Environmental Monitoring and Audit Schedule for February 2012_ 3

Table 2.1:__ Air Quality Monitoring Parameters, Frequency and Duration_ 4

Table 2.2:__ Air Monitoring Stations_ 4

Table 2.3:__ TSP Monitoring Equipment 4

Table 2.4:__ Noise Monitoring Parameters, Frequency and Duration_ 4

Table 2.5:__ Noise Monitoring Stations_ 4

Table 2.6:__ Noise Monitoring Equipment 4

Table 2.7:__ Water Quality Monitoring Parameters, Frequency and Duration_ 4

Table 2.8:__ Water Quality Monitoring Stations_ 4

Table 2.9:__ Water Quality Monitoring Equipments_ 4

Table 2.10:_ Analytical Methods applied to Water Quality Samples_ 4

Table 2.11:_ Detection Limits for Water Quality Determinants_ 4

Table 2.12:_ Summary of Construction Phase Ecological Monitoring for the Wo Shang Wai Wetland Restoration Area (WRA) 4

Table 2.13:_ Construction and Operation Phase Audit Checklist 4

Table 2.14:_ Proposed Construction Phase Mitigation Measures_ 4

Table 2.15:_ Proposed Operation Phase Mitigation Measures_ 4

Table 3.1:__ Summary of 1-hour TSP Monitoring Results_ 4

Table 3.2:__ Summary of 24-hour TSP Monitoring Results_ 4

Table 3.3:__ Summary of Construction Noise Monitoring Results_ 4

Table 3.4:__ Summary of Water Quality Monitoring Results_ 4

Table 4.1:__ Summary of Ecological Monitoring in WRA and Survey Area_ 4

Table 5.1:__ Construction and Operation Phase Audit Summary 4

Table 6.1:__ Summary of Site Inspections and Recommendations_ 4