Content

Chapter    Title                                                                                                                           Page

1.1                  Background_ 1

1.2                  Project Organization_ 1

1.3                  Environmental Status in the Reporting Period_ 1

1.4                  Summary of EM&A Requirements 2

2.1                  Introduction_ 4

2.2                  Air Quality 4

2.3                  Construction Noise_ 7

2.4                  Water Quality 8

2.5                  Ecology 11

2.6                  Landscape and Visual 12

3.1                  Impact Monitoring Schedule_ 15

3.2                  Results of Impact Monitoring_ 15

4.1                  Introduction_ 21

4.2                  Monitoring of Birds 21

4.3                  Monitoring of Herpetofauna_ 21

4.4                  Monitoring of Dragonflies and Butterflies 21

4.5                  Monitoring of Mammals 21

4.6                  Monitoring of Water Quality 21

4.7                  Monitoring of Soil Quality 22

4.8                  Management Activities 22

4.9                  Summary 22

5.1                  Site Inspections 23

5.2                  Construction Phase Audit Summary 23

6.1                  Site Inspection_ 26

6.2                  Advice on the Solid and Liquid Waste Management Status 26

6.3                  Status of Environmental Licenses and Permits 26

6.4                  Recommended Mitigation Measures 27

7.1                  Record on Non-compliance of Action and Limit Levels 28

7.2                  Record on Environmental Complaints received_ 29

7.3                  Record on Notifications of Summons and Successful Prosecution_ 29

7.4                  Review of Reasons for and Implications of Non-compliance, Complaints, Summons and Prosecutions 29

7.5                  Follow-up Actions Taken_ 30

7.6                  Cumulative Statistics for Complaints, Notifications of Summons and Successful Prosecutions 30

8.1                  Site Preparatory Works and Construction Works for the Coming Month_ 31

8.2                  Key Issues for the Coming Month_ 31

8.3                  Monitoring Schedule for the Coming Month_ 31

8.4                  Conclusions and Recommendations 33

 

Tables

Table 1.1:__ Summary of Impact EM&A Monitoring Requirements 2

Table 1.2:__ Environmental Monitoring and Audit Schedule for June 2013_ 3

Table 2.1:__ Air Quality Monitoring Parameters, Frequency and Duration_ 4

Table 2.2:__ Air Monitoring Stations 4

Table 2.3:__ TSP Monitoring Equipment 5

Table 2.4:__ Noise Monitoring Parameters, Frequency and Duration_ 7

Table 2.5:__ Noise Monitoring Stations 7

Table 2.6:__ Noise Monitoring Equipment 8

Table 2.7:__ Water Quality Monitoring Parameters, Frequency and Duration_ 9

Table 2.8:__ Water Quality Monitoring Stations 9

Table 2.9:__ Water Quality Monitoring equipment 9

Table 2.10:_ Analytical Methods applied to Water Quality Samples 9

Table 2.11:_ Detection Limits for Water Quality Determinants 10

Table 2.12:_ Summary of Construction Phase Ecological Monitoring for the Wo Shang Wai Wetland Restoration Area (WRA) 11

Table 2.13:_ Construction and Operation Phase Audit Checklist 13

Table 2.14:_ Proposed Construction Phase Mitigation Measures 13

Table 2.15:_ Proposed Operation Phase Mitigation Measures 14

Table 3.1:__